SECTION .1100 ‑ FUEL ALCOHOL PERMITS

 

14B NCAC 15C .1101      APPLICATION FOR FUEL ALCOHOL PERMIT: OPERATION

(a)  Required Information. In addition to the information required by G.S. 18B‑900 and G.S. 18B‑902, an applicant for a Fuel Alcohol Permit shall furnish the following information to the Commission:

(1)           Federal Operating Permit number and a photocopy of the Federal Operating Permit; and

(2)           detailed diagram of fuel alcohol plant premises, identifying roads, streams, lakes, buildings, and other structures on or features of the land that will locate exactly the place where plant operations will occur.

(b)  No person shall commence the operation of a fuel alcohol plant without first applying for and obtaining a Fuel Alcohol Permit from the Commission.

 

History Note:        Authority G.S. 18B-100; 18B‑207; 18B‑1105(b);

Eff. January 1, 1982;

Amended Eff. May 1, 1984;

Transferred and Recodified from 04 NCAC 02T .1101 Eff. August 1, 2015;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. August 19, 2017.